Sicc Media // Break the Mold \\ DARE TO BE EXTRAORDINARY.

Tag: customer expectation management service delivery

  • Educating Clients to Prevent Dissatisfaction

    Educating Clients to Prevent Dissatisfaction

    Almost every complaint is the same complaint: something happened that the customer was not expecting.

    TL;DR Write down what will happen before it happens. Over-communicate the unglamorous parts, especially mess, noise and timing. Give a range and beat it. A care sheet at the end prevents the callback.

    The real cause of complaints

    Dissatisfaction is the gap between expectation and reality, not a measure of quality.

    Excellent work delivered a day late to someone who expected it on time produces a complaint. Average work delivered exactly as described does not.

    Which means most complaints are preventable with information, not with better work.

    What people are never warned about

    The recurring set, across almost every trade.

    Reality What they assumed
    Dust and mess during the work It would be tidy throughout
    Noise, and how much Background level
    Water or power off for hours Brief interruption
    Access needed to more rooms Just the one room
    A second visit for parts One visit, done
    The site looks worse mid-job Steady visible progress
    Cure and dry times Usable immediately
    Final finish arrives late Perfect from day one

    Every one of these is a routine part of the job and a shock to the customer. Naming them in advance converts a complaint into a shrug.

    The pre-arrival message

    Sent the day before, every job, no exceptions.

    Hi Sarah, we will be with you between 8 and 10 tomorrow.

    A few practical things:

    • Water will be off roughly 10am to 2pm. Worth filling a kettle and a jug.
    • It will be noisy for about an hour when we are cutting out the old pipework.
    • We will need access to the airing cupboard and the loft hatch.
    • There will be dust. We sheet up, but if there is anything you would rather move, now is the time.
    • We will clear up before we leave.

    Anything you want to check, just reply.

    This one message prevents more complaints than anything else on this list.

    Give a range and beat it

    Never give a single-point estimate. You will be judged against it exactly.

    Instead

    Most jobs like this take two days. Occasionally three if the pipework is in worse shape than it looks from here. I will tell you at the end of day one which it is.

    Then finish in two days and you have exceeded expectations. Give “two days”, finish in two days, and you have merely met them, with no margin for the thing that always goes wrong.

    Update the moment the estimate changes. A delay communicated in advance is information. The same delay discovered by the customer is a failure.

    The what-to-expect guide

    One page, reusable, sent at booking.

    Contents

    1. Stages, in order, with rough timings.
    2. What we need from you, listed.
    3. What it will look like partway through.
    4. What is not included, explicitly. Making good, decorating, disposal, whatever applies.
    5. How we handle problems, with the escalation contact.

    The “not included” section is the most valuable. Almost every scope dispute traces back to an assumption nobody wrote down.

    The post-service care sheet

    Prevents the callback and protects the work.

    Contents

    • What to do in the first 24 to 48 hours. Curing, settling, first-run behaviour.
    • What is normal. Noises, smells, small settling. Naming these prevents a panicked call.
    • What is not normal, and what to do about it.
    • Routine maintenance, and how often.
    • Warranty terms, in plain language.
    • Who to call, with a real number.

    Normal in the first week: a faint smell for the first two heating cycles, and a ticking sound as the pipes expand. Both settle.

    Not normal: any visible water, or a burning smell. Turn it off at the switch and ring me.

    The “what is normal” list is disproportionately useful and almost nobody produces one.

    Educate on price, not just process

    Most price objections are information gaps.

    • Break the quote into components. Labour, parts, disposal, compliance. An undifferentiated figure invites suspicion.
    • Explain what the cheaper option omits, without disparaging anyone.
    • Show the cost of doing it twice. Arithmetic, not fear.
    • Be clear about what could change the price, and what will not.

    Say the bad news first

    Counterintuitive and consistently effective. Raise the problem before they find it.

    Before I invoice, one thing: the plaster around the pipe run cracked when we pulled the old section out. It is not something we could have avoided given how it was fitted, but I wanted to tell you rather than have you find it. It needs a decorator, small job. Sorry about that.

    Volunteered bad news reads as honesty. Discovered bad news reads as concealment. Same fact, entirely different outcome.

    Measure it

    • Complaints per hundred jobs, before and after introducing pre-arrival messages.
    • Scope disputes, which should approach zero with a written not-included list.
    • Callbacks in the first week, which the care sheet addresses.
    • Reviews mentioning communication, which is where this shows up.

    Write the pre-arrival message template this week, listing mess, noise, access and timing. Send it on every job the day before. It is the highest-return document in your business and it takes twenty minutes to write once.

    Need a pro to build the templates? [BOOK A CALL]