For masonry and hardscape contractors ยท Content design

Content design for masons.

A big hardscape job is sold over several weeks and several pieces of paper. Each one, from the first mailer to the estimate sheet, should look like it came from a contractor who plans carefully.

Or text (508) 546-9942

Slide it

You vs. John Doe Masonry.

Left is your page today. Right is John Doe Masonry. Drag the line, then hit the button.

Crickets on the left. That is the problem.

You, right nowYou, fixed
Your BusinessLocal business
PostsAboutPhotosReviews
Nothing to see here.Last post: March 2019chirp  ·  ·   chirp
John Doe Masonry
JD
John Doe MasonryLocal business · Open now
PostsAboutPhotosReviews
JD
John Doe Masonry3 weeks ago

We are open Monday to Friday. Call for a quote.

stock photo of a handshake
Liked by Joe's mom

Illustration. Joe is made up. Your competitor is not.

The masonry contractor version

Why it matters.

Consider what a homeowner sees before signing for a retaining wall: maybe a mailer, your site, a few posts, then a printed leave-behind on the kitchen table. If that sheet is a plain document and the posts each use a different style, the polish of your stonework never makes it onto paper. Consistent, well-designed pieces carry the impression of care from first contact to signature.

If you already post and send emails yourself, you do not need someone to run them. What you need are templates that turn a finished project into a clean case study, a set of posts and a leave-behind without spending an evening in a design app.

What I would build

For a masonry contractor.

01Project case study layouts

Case study and before-and-after layouts built for hardscape: the site before, the build stages, the finished work, the materials used. Reusable templates, so each new project drops in fast.

02A leave-behind for site visits

Print collateral for the estimate visit: a sheet of comparable projects, how you build, and what happens next. It stays on the counter after you leave, while the other quotes arrive as plain emails.

03Post and story graphics

Post and story graphics in your brand, sized for each platform, including progress series and detail callouts. You publish on your own schedule from your own accounts.

04A winter newsletter to past clients

Email and newsletter design for the slow season: finished projects, care reminders like sealing pavers, and an early booking note. Past clients are where repeat and referred work comes from.

The mistake I see

Letting the paperwork look cheaper than the work

A mason can lay a flawless wall and then send an estimate that looks like it was typed on a phone. On big jobs the homeowner often decides at the kitchen table with several quotes side by side. The one that looks organized and explains the build makes its price easier to accept.

What you get

Content design.

For the business that has the posting handled but cannot stand making the posts.

  • Post and story graphics in your brand
  • Templates you can reuse without me
  • Case studies and before-and-after layouts
  • Email and newsletter design
  • Print collateral when you need it
Price. Single fixes start at $499. Monthly batches are quoted after a call.

Full content design details →

How it goes

For a masonry contractor, step by step.

→ Keep scrolling. It moves sideways.

  1. Set the templates

    So everything after this is fast and consistent.

  2. Agree a batch

    Monthly or per campaign, whichever suits how you work.

  3. Make it

    Delivered as finished files, sized for where they are going.

  4. You publish

    On your schedule, from your accounts.

  5. Step five is you.

    The free Receipt shows what your masonry contractor should fix first. About half a minute, no card.

    Print my Receipt →

Questions

What masonry and hardscape contractors ask.

Can you design my estimate template?

Yes, as part of print collateral and templates you reuse without me. I design the layout, the cover and a section showing comparable projects. You keep filling in the numbers in whatever tool you already use. The goal is an estimate that looks as careful as the work it describes.

Do printed pieces still matter for masonry?

Hardscape is a considered purchase, and a printed sheet left after the visit gets passed around the household. It also helps when a spouse who missed the site visit is part of the decision, since they see the same projects you showed. It is a small thing, and one more piece of paper that says you planned.

What should a masonry case study include?

The problem, the build and the result. What the site looked like, what was wrong with it, what you built and from what, and how the base and drainage were handled. A finished photo alone shows taste. The build story shows why your quote was the right one.

What comes after

Pairs well with.

Wrong problem? Pick again

I run and I keep losing jobs to

The list is not everything. Not on it? Pick “a business not listed,” or run the free Receipt. It works for any business.

Start here

See what your customers see.

The Receipt looks your masonry contractor up the way a customer would and itemizes what is costing you calls. It is free. Or skip it and book fifteen minutes with me.

Or text (508) 546-9942